PROJECTS
Dredging at Holiday Beach - 1
LEBANON
PORTS / DREDGING / SURVEYING / Middle East / Marinas /
CLIENT
LEBANESE REPUBLIC
Ministry of Public Works and Transport
Directorate General of Land and Maritime Transport
CONSULTANT
SEATEC sarl
LOCATION
LEBANON - Nahr el Kalb
33°57'27"N
35°35'45"E
Year: 2009
Design / Surveying
Dredging at Holiday Beach Marina and Nahr el Kalb river
- Dredging works of Holiday Beach Marina basin and Nahr el Kalb river mouth up to -2.00, -3.00, -3.50, -4.00 and -5.00m MSL
- Topographic survey (20,500m2)
- Bathymetric survey (145,000m2)
- Tender Documents / Specifications / Drawings / BoQ