PROJECTS
Tyre Fishing Port
LEBANON
PORTS / SURVEYING / LIFT STRUCTURES / Middle East / Fishing Ports / Slipways /
CLIENT
LEBANESE REPUBLIC
Ministry of Public Works and Transport
Directorate General of Land and Maritime Transport
CONSULTANT
SEATEC sarl
LOCATION
LEBANON - Tyre
33°16'27"N
35°11'45"E
Year: 2009
Design / Surveying
Tyre Fishing Port
- Berthing capacity (260 berths)
- Rehabilitation of the existing and old breakwater (Rubble mound type, L~100m @max -6.00m)
- Core reshaping, installation of rocky filter and 16m3 concrete Accropodes blocks Type 1 (Armor layer) for the BW
- Installation of rocky layer on the breakwater inner slope
- RC crown wall
- Quaywalls (L=206m @-2.00m MSL) / Precast concrete blocks (Gravity QW)
- Finger piers (L=50m @-2.00m MSL) / Precast concrete blocks
- Finger pier (L=30m @-3.00m MSL) / Precast concrete blocks
- 3 Water Outlets (Total L=55m)
- RC platforms (3,100m2)
- Slipway (Boat ramp)
- Rehabilitation of existing seawall (L=219m; H=2.00m)
- Marine accessories (Mooring bollards)
- Basin dredging (26,850m2) @-3.00m MSL / Offshore dumping of dredged materials using split barges
- Topographic survey
- Bathymetric survey (35,000m2)
- Tender Documents / Drawings / BoQ

Year: 2010
Works Supervision
- Contractor : Khoury Contracting Company sarl (KCC)
- Duration    : 18 months