Year: 2024
Conceptual Design
Douala Port expansion
- Master Plan
Container Terminal
- Quaywall (L=250m @-6.050m LAT) / Piling system
- Terminal platform (135,750m2)
- Terminal area for containers storage (57,000m2)
- Maintenance area (5,200m2)
- Trucks parking (17,000m2)
- Feeders area (1,620m2)
- Warehouses (1,620m2)
- Workshops (400m2)
- Offices (2,400m2)
General Cargo Terminal
- Quaywall (L=245m @-6.50m LAT) / Piling system
- Terminal platform (37,000m2)
- Warehouses (9,720m2)
Ro-Ro Terminal
- Quaywall (L=100m @-6.50m LAT) / Piling system
- Terminal platform (6,900m2)
Maintenance area
- Slipway
- Area (10,600m2)
- Workshops (615m2)
Parking with photovoltaic pannels
- Area (29,800m2)
Offices
- Area (57,200m2)
- Offices area (21,600m2)
- Basin and entrance channel dredging @-6.50m LAT.
- Drawings / BoQ