Year: 2022
Design / Surveying / Permitting
Coastal Protection for Plot 2699
- Rehabilitation of the existing heavily damaged marine infrastructure
- Sloped protection (Rubble mound type, L=167m @max -6.00m, core material, rocky filter and rocky armor layer)
- RC seawalls and platforms
- Topographic survey (6,800m2)
- Bathymetric survey (52,00m2)
- Drawings / BoQ / Permitting