Year: 2019
Design / Surveying
Jieh Fishing Port - Phase 2
Extension works for the existing fishing port
- New Main Breakwater (Rubble mound type, L=308m @max -7.00m MSL, core material, rocky filter and 16m3 precast concrete Accropodes blocks Type I)
- Secondary Breakwater (Rubble mound type, L=75m @max-1.00m MSL, core material, rocky filter and armour layer)
- Dismantle and excavation of a part of the existing main breakwater (L=157m)
- Crown walls
- Quaywalls (L=290m @-3.00m MSL) / Precast concrete blocks (Gravity QW)
- Quaywalls (L=147m @-4.50m MSL) / Precast concrete blocks (Gravity QW)
- Finger Piers (L=96m @-3.00m MSL, Nbr 2) / Precast concrete blocks (Gravity QW)
- Finger Piers (L=48m @-4.50m MSL, Nbr 1) / Precast concrete blocks (Gravity QW)
- Basin dredging @-3.00m / -4.50m MSL
- Asphalted and concrete platforms
- Accessories (Mooring bollards, lighting and water supply)
- Additional berthing capacity (230 boats)
- Topographic survey (13,300m2)
- Bathymetric survey (408,800m2)
- Tender Documents / Drawings / BoQ