Year: 2016
Design / Surveying / Permitting
- Sloped protection (Rubble mound type, L=442m @max -5.00m, precast concrete 6.3m3 Accropodes blocks Type I)
- Reclaimed area layout (14,464m2)
- Offshore pipelines (L=535m) with CBM berth for oil products import
- Decree modification for offshore pipelines, tankers berth CBM and reclaimed land occupancy
- Topographic survey (14,000m2)
- Bathymetric survey (216,000m2)
- Drawings / BoQ / Permitting