Year: 2016 - 2017 - 2018 - 2019
Design / Surveying / Permitting
Natour Development
- Fishing / Marina Master Plan
- Vertical Concrete Main Breakwater
- Quaywalls / underwater concrete blocks (Gravity QW)
- Concrete platforms
- Dredging and excavation wporks for access channel and basin
- Accessories (Jib Crane, mooring bollards, fenders, lighting, water supply...)
- Beach Club design (Waves run-up / overtopping assessment)
- Waterfront protection
- Topographic survey
- Bathymetric survey (5,920,000m2)
- Underwater inspection
- Specifications / Drawings / BoQ / Permitting