Byblos Fishing Port - Phase 1
- Rehabilitation of the historical fishing port
- Berthing capacity (85 boats)
- Rehabilitation of the existing and damaged secondary breakwater head at the port entrance (Underwater concrete) and reconstruction of sandy stones
- Demolition and removal of old quaywalls
- New quaywalls (L=279m @max -3.00m MSL) / Underwater concrete blocks (Gravity QW)
- RC Platforms (1,200m2)
- Pedestrian pathways
- RC retaining walls
- Slipway
- Dredging works of inner basin up (5,200m2) to -3.00m MSL
- Marine accessories (Mooring bollards)
- Landscape
- Infrastructure (Electrical supply, pipes, manholes, lighting)
- Infrastructure (Water supply, Pumps, pipes, manholes, tanks)
- Waste water treatment plant
- DGLMT and Port master rooms (140m2) / Nbr=5
- Topographic survey (3,000m2)
- Bathymetric survey (7,500m2)
- Tender Documents / Drawings / BoQ