PROJECTS
Manara Fishing Port
LEBANON
PORTS / DREDGING / SURVEYING / LIFT STRUCTURES / Middle East / Fishing Ports / Slipways /
CLIENT
LEBANESE REPUBLIC
Ministry of Public Works and Transport
Directorate General of Land and Maritime Transport
CONSULTANT
SEATEC sarl
LOCATION
LEBANON - Manara
33°54'2"N
35°28'16"E
Year: 2013
Design / Surveying
Manara Fishing Port
- Master PLan
- Berthing capacity (160 boats)
- Main breakwater (L=319m @max -12.00m MSL, rubble mound breakwater type, armor layer of 16m3 precast concrete Accropodes Blocks Type I)
- RC crown walls
- RC retaining walls
- Quaywalls (L=165m @-2.50m MSL) / Precast concrete blocks (Gravity QW)
- Quaywalls (L=97m @-3.00m MSL) / Precast concrete blocks (Gravity QW)
- Quaywalls (L=169m @-4.00m MSL) / Precast concrete blocks (Gravity QW)
- Finger Pier (Nbr=1; L=46m @-3.00m MSL) / Precast concrete blocks
- Finger Pier (Nbr=1; L=30m @-4.00m MSL) / Precast concrete blocks
- Slipway (Boats ramp)
- Dredging works of basin and quaywalls foundation up to -2.50m MSL
- Dredging works of breakwater toe up to max -15.00m MSL
- RC Platforms (11,350m2)
- DGLMT, Army and Fishermen rooms (Nbr=6; 180m2)
- Fish market (162m2)
- Waste water treatment plant
- Reclaimed areas (23,480m2)
- Water body Basins (13,600m2)
- Topographic survey (8,000m2)
- Bathymetric survey (270,300m2)
- Drawings / BoQ