Dbayeh Waterfront
LEBANON
WATERFRONTS / COASTAL PROTECTIONS / SURVEYING / Middle East / Revetments /
CLIENT
LEBANESE REPUBLIC
Ministry of Public Works and Transport
Directorate General of Roads and Buildings
CONSULTANT
SEATEC sarl
LOCATION
LEBANON - Dbayeh
33°57'10"N
35°35'32"E
Year: 2015
Design / Surveying
Dbayeh Waterfront
- Highway protection and rehabilitation works
- Rehabilitation of the heavily damaged rocky riprap along existing Dbayeh highway (L=1,359m @max -5.15m MSL) / Sloped protection (Rubble mound type, QR core, rocky filter and 6.3-9-12 and 16m3 concrete Accropodes Blocks Type I armor layer)
- 18m3 concrete Accropodes Blocks Type I (Submerged reef)
- Additional protection along Nahr el Kalb river bank (Rubble mound type, rocky armor layer, RC flood wall)
- Dredging for protection toe
- Excavation of existing protection and walkway
- New walkway (Additional width) for pedestrians
- Infrastructure (Electrical supply, pipes, manholes, lighting poles)
- Infrastructure (Water supply, manholes)
- Extension of RC Box culverts (Nbr=7)
- Storm water system for the area under the bridge
- Landscaping (Washingtonia robusta trees, waste containers)
- Bituminous coating / marking of coastal road (1,650m)
- Excavation works
- Topographic survey (55,100m2)
- Bathymetric survey (1,114,000m2)
- Geotechnical investigation
- Tender Documents / Drawings / BOQ

Year: 2016 - 2018
Works Supervision
- Contractor : ARACO Lebanese for Asphalt
- Duration    : 24 months