PROJECTS
Waterfront City Marine Outfall
LEBANON
COASTAL PROTECTIONS / SURVEYING / SEALINES / PERMITTING / Middle East / Revetments / Marine Outfalls /
CLIENT
Waterfront City sarl
CONSULTANT
SEATEC sarl
LOCATION
LEBANON - Dbayeh
33°55'10"N
35°34'52"E
Year: 2012 - 2013 - 2014
Design / surveying / Permitting
Waterfront City Marine Outfall
- HDPE marine outfall (D=50cm; L=920m) and diffuser (D=50cm; L=36m) @max -17.00m MSL
- Hydraulic design / Diffusion modeling
- Collars and rocky protection
- Waste water treatment plant
- Land reclamation (3,000m2) with rocky protection / RC sea wall for the WWTP
- Topographic survey
- Bathymetric survey (116,000m2) 
- Specifications / Drawings / BoQ / Permitting